Electrical Diagrams
⚠️ WARNING: Maintenance on Sep. 3rd at 10AM MT
This website will be going down for approximately 2 hours starting at 10AM MT on 9/3/2026 to be moved to a new location. In the future please use http://epic.earthscope.org to reach this website (do NOT use http://www.passcal.nmt.edu)
Power Management Module (PMM): Enclosure containing the charge controller and power switcher.
Short battery harness: Connects battery to multiple battery harness or other load cable.
Short 5-pin/3 battery: Connects primary and rechargeable batteries to PMM.
Battery harness connects 2: Connects 2 rechargeable batteries together.
Battery harness connects 10: Connects 10 primary battery packs together.
Battery harness connects 8: Connects 8 rechargeable batteries together.
Related categories:
- Home
- General Information
- Instrumentation
- Dataloggers
- Sensors
- All-In-One Systems
- Power Systems
- Field Procedures
- Controlled Sources
- Seismic Source Facility
- Magnetotelluric Systems at EPIC
- Ground Penetrating Radar
- GNSS/GPS Receivers
- Power and Memory Calculations Form
- Electrical Resistivity Tomography
- Data Archiving
- Apply for a PI Account
- Experiment Scheduling
- Polar
- Hardware & Software Notes
- Software